Don't Just Fill Your Oils ...

... Track Them ?

Why? I'm glad you asked !!

Did you know that filling your way lube tank can tell you a story about your machine's performance. It can, if you use the information to your advantage. How?


The best way is to make an oil fill reminder form and post it on the machine. Each time oil, any type of oil, is added to the machine, have the operator jot down the following:

  • Type of oil added
  • Date and Time the oil was added
  • Amount of oil added
  • On a turning center, when the chuck was greased

This data can be used for the following :

Type Of Oil : this tells you which oil tank might be giving you trouble. If you're filling the hydraulic tank (a closed system) - WHY and WHERE is the oil leaking from. Low hydraulic oil could result in a loss of pressure and perhaps an un-chucking of a part being machined with catastrophic results. If you're replacing way-lube (which you should), what kind of schedule are you on. This list should show a difference in the frequency of the filling which will easily and early show a way-lube system problem and head-off major repairs.

Date and Time the oil was added : this info gives you a clear view of the filling schedule. Again, not filling the way-lube tank, for example, will be easily seen and catastrophe can be averted.

Amount of oil added : as above, this info gives you a clear schedule of the filling schedule. Filling the way lube tank once every two days instead of once every three days will show up and might signal a line break or other problem that can easily be spotted and repaired in time.

As with everything in life, the info gathered is only as good as the person viewing it. Teach you operators to be hands-on people and to pay attention to this list, perhaps every morning with the machine start-up. Simple ideas like this TIP can help extend your machine's life and cut down dramatically on your machine's down time and repair bills.

Live Long ... and Make Chips !!

Wednesday, June 5, 2013

Spindle Load vs. Spindle RPM

Which is the true test of how hard your machine is working ?

If you had to watch the spindle speed meter or the spindle load meter on your CNC machine ... lathe or mill ... to determine if your machine was working too hard, which one would you choose?


The truth of the matter is that although the spindle load meter does tell you the power draw on the spindle motor, the RPM gage is a more accurate representation of how hard the spindle is working. Most machines come with a specific rating for load % per a specific time such as (in laymans terms) : "You can run this machine at 100% for 30 minutes."


That is of course a true statement and you can watch the load meter while cutting and reach that spec. However, if you watch the RPM gage while cutting and see it fluctuate wildly - basically because the motor is trying to keep the spindle at the specified (programmed) RPM - you'll never reach that 30 minute time frame. Because the cutting is so heavy in this type of case, the motor must keep "powering up" to keep the programmed RPM specified. This takes much more power draw on the motor than simply running constant at 100% load for the 30 minutes.

The Solution : When your machine is cutting, watch the RPM gage first to insure that the cutting conditions are resulting in a smooth RPM for the spindle and not wild fluctations as the motor fights to keep the speed constant. Secondly, adjust the cutting conditions so that the load meter is as high as you think you want (there is nothing wrong with 70-75%) and then recheck the RPM gauge to make sure that the RPM's are smooth at those settings. Smooth RPM cutting will result in better life for the spindle motor and smoother surface finish on the workpiece as well.

Happy Chip Making !!

Check out our Real World World machine shop software at www.KentechInc.com
Conversational CAD/CAM
Quoting & Estimating
G Code Conversion
CNC Training
.... and MORE !!!

Wednesday, March 27, 2013

Your Way Lube System - Friend or Foe ?


Your CNC machine is equipped with an automatic oiler system. Great ! You won't have to think about oiling the machine and an alarm will tell you when the tank is dry. What a great device ? Right ?

Well, that is the design. Unfortunately, along with the "automatic" description of the system comes the "out of sight, out of mind" aspect of the system. Because many people know it is an automatic system, many people put it out of their minds and simply wait for the alarm to come up showing that the tank is empty and needs to be filled. But what if that alarm never comes on because the tank isn't empty ? Why wouldn't the tank be empty ?

As your machine gets older, the way lube system will require service just like any other mechanism. The main problem, which often gets overlooked, is that the "tank empty" alarm never comes on because the tank never drains and nobody ever notices it. Now your machine runs for months on end with no lubrication on the ways and when you finally notice a problem, it's too late. Here is the "Rest of the Story ..."

PROBLEM :  The machine's ways are not receiving any way lube oil.

SYMPTOMS - IN ORDER OF SEVERITY :
  • Positioning / Repeatability Problems
  • Axis makes noise when moving
  • Axis Drive motor overload alarm coming when the axis is moving
POSSIBLE CAUSES :

  • Way Lube Pump burned out.
  • Way Lube Pump distribution flow set too low.
  • Way Lube Pump filter CLOGGED
  • Way Lube line BROKEN
  • Metering Units are CLOGGED
POSSIBLE CAUSES EXPLAINED :

(1) Way Lube Pump Burned Out : If the way lube pump is burned out, obviously there will not be any lube getting into the system. These pumps are usually set using a timer system. There is basically two types of timer systems used :

  • The pump is on a cam and the way it works is that the pump is always running. One gear turns another which acts like a step-down system and the second gear raises a "primer" lever. When the lever reaches the top of the stroke, the "primer" lever is released and the oil is pushed into the lines. This whole cycle can take 5-20 minutes meaning that even though the pump is always running, the lines get lube only every 5-20 minutes.
  • How to Check It : Take a flashlight and look in the tank or remove the oil tank. Once looking inside, you can see the main gear that should be constantly moving. It may be at a very slow pace, but you will see it moving.
  • The pump is set to an electrical timer set in the controls PC (programmable controller) or an actual physical electrical timer in the cabinet. This type of timer only supplies power to start the pump for every cycle.
  • How to Check It : On some pumps there is no primer lever but a light comes on on the tank when the pump is activated. Make sure this light comes on every 5-20 minutes or some other sign comes on to show the pump is activated every 5-20 minutes.

(2) Way Lube Pump distribution flow set too low : As stated above, the way lube pump usually is set using a timer system. The flow amount that gets distributed into the lines during every cycle is usually set and adjusted at the pump with a manual setting mechanism. This type of adjusting mechanism is usually a knob that can be turned higher or lower to set more or less flow. Also, just look at the primer lever. During the mentioned 5-20 minute cycle, you should see the primer lever raise slowly and then start to drop after reaching the top of the cycle. Check the stroke of the lever - short stroke, less flow.
  • How to Check It : The normal pump usage is in an 8 hour shift, you should fill the tank every 2-3 days. Also, you should see way lube flowing onto the ways. Always remember, the more flow the better. Yes, it may contaminate the coolant but that is better than ruining the ways and thus the machine just to save a couple of bucks.

The photo above shows a way lube pump unit which includes a manual flow control device. Adjusting the white knob adjusts the amount of lube being distributed per one cycle of the lube pump. When this type of pump is working correctly, you can see the white knob rising slowly then retracting, pushing the lube into the lines. The amount of rise and fall, and therefore the amount of lube distributed, is determined by the flow adjustment.

(3) Way Lube Pump filter CLOGGED : The way lube tank usually has a filter between the tank itself and the oil line that starts the distribution. This filter is usually in the tank itself at the bottom of the primer lever or in-line right after the main distribution line leaves the tank. It will get clogged over time, especially if there is no filter at the oil fill hole or if someone takes off the filter when filling the tank.
  • How to Check It : Disconnect the main lube line where it exits the tank to feed the system or after the in-line filter if so equipped. When the cycle reaches the pump stage as outlined above, oil should flow through this connection. The flow should be strong at this point. If not, remove the oil tank and search out the filter or remove the in-line filter. They can often be cleaned with a cleaner but the best remedy is to replace it.
(4) Way Lube line BROKEN : Oftentimes a lube line in the system gets crimped or broken during machining or during service. These way lube systems are usually "pressurized" so to speak and if the pressure is released at one point, say at the broken line, the oil will flow all to that point, depriving all the other lines of fluid.
  • How to Check It : When the pump is in the pumping stage, the primer lever should fall slowly. This is due to the fact that it is pushing the oil into the system. If a line is broken, the primer lever will fall quickly as all oil is funneled to the broken line area only. On systems without a primer lever, the pump may have a pressure gauge on the pump. During the pumping cycle, the pressure should register for a couple of seconds as the oil is pumped into the lines. If the pressure is low or does not come up at all during the pumping cycle, a line in the system may be broken.
(5) Metering Units are CLOGGED : In order to create the "pressure" of the system needed for even distribution, each oil line leads to a "metering unit" where the flow is lowered and the oil is discharged. When the pump forces oil into the lines, they all fill and flow to the metering units where the flow is stopped. Each metering unit is set to discharge the desired amount or "drops" of oil and perform their individual duties. Since some areas require more lube, the metering units can be different for each line or area. Since these metering units have actual valve type components in their very small bodies, over time these units can be become clogged or the inner workings can become stuck.
  • How to Check It : This is a much harder area to check. The best remedy and prevention is to change these units every year as part of a yearly maintenance program. Because these units allow only drops to flow through, they are harder to see when troubleshooting. These metering units are usually located in "clumps" around the machine. Several lines lead to these central areas and lube lines are branched out from here to the various areas of the machine. Replacement metering valves should be obtained from the machine tool builder or dealer to insure that you are getting the correct replacement part. When changing these units, pay close attention to the flow arrow that is commonly marked on the units themselves. This arrow shows the direction of installation and flow. Check the original unit before removal and replace accordingly.

The photo above shows an example of some metering units. These individual fittings are usually located in one or two main terminal blocks that feed certain areas of the machine such as the axis and ball screws. As the system fills with pressure and lube, these fittings discharge the lube at their pre-set flow rate into their lube lines. Over time, like cholesterol in the arteries, these units become clogged and no longer allow lube to exit and thus deny vital areas of the machine the way lube they require. As part of a yearly maintenance program, metering units in the machine should be replaced as a precautionary measure.

Due diligence and a little tracking will 
insure your Happy ( and ACCURATE ) Chip Making
 for years to come !!



Check out our Real World World machine shop software at www.KentechInc.com
Conversational CAD/CAM
Quoting & Estimating
G Code Conversion
CNC Training
.... and MORE !!!




Wednesday, February 27, 2013

Canned Cycle Drilling and R Plane Tricks

Wasting time drilling air when "drilling" holes in a part with multiple levels is not uncommon for the novice programmer. In this Making Chips post ... we would like to discuss the always important R plane and how you can easily control it in your G code program.

First ... the FACTS :

There are two planes that the programmer needs to be concerned with :

INITIAL PLANE ... this is the plane used for rapiding around the workpiece. This plane should always be set high enough to avoid the workpiece as well as any clamps or other fixture related objects that can be struck by the tool as it moves around the part.
  • On  Fanuc controlled or Haas machine ... the initial plane is defined as the last Z position before the canned cycle is called. So in the sample code below :
G00 G90 Z1.000
G98 G81 Z-.500 R.050 F1.0

  • Z1.00 would be considered the INITIAL PLANE ... because it is the last Z position prior to the the G81 canned cycle command.
  • In an Okuma machine ... the user can set the INITIAL PLANE by commanding a G71 Z--- line prior to the canned cycle command line. So ... imitating the above Fanuc line ... we would program :
G71 Z1.000
G81 Z-.500 R.050 F1.0

R PLANE : The R plane is defined as the plane at which the drilling operation begins. So basically the tool rapids from the Initial Plane to the R plane ... and then starts the drilling operation. The R plane is defined in the canned cycle command line. So in the above examples ... R.050 is defined as the R plane ... the point where the drilling operation would begin.

In the above programs ... the tool would rapid from the Z1.00 initial plane to the Z.050 R plane.

After drilling ... we can tell the tool where to return by using the G98 ( initial plane return ) or G99 ( R plane return ) ... for Fanuc / Haas ... in the canned cycle command line. Once commanded ... G98 / G99 becomes modal ... which means the machine will remember where it is supposed to return ... until told differently. When programming for Okuma ... we can use the M53 ( like G98 ) / M54  ( like G99 ) commands.

NEXT ... the TRICKS :

Did you know that you can very easily change the R plane when drilling on uneven surfaces?
Did you know that you can very easily change the return point between the INITIAL and R planes?

As mentioned above ... once G98 or G99 is set ... the control remembers where to go.
Also ... once the R plane is set in the canned cycle command ... it remembers where the R plane is.

But you can change either very easy ... just command it !! Like this :

(1) G00 G90 Z1.000
(2) G98 G81 Z-.500 R.050 F1.0
(3) X1.00 Y1.00
(4) G99 X2.00 Y2.00
(5) X3.00 Y3.00 R-.100
(6) G98 X4.00 Y4.00 R.050
(7) G80

(1) - Sets the Initial Plane as Z1.00
(2) - Sets the R plane as Z.050 ... return to the Z1.00 after drilling this hole
(3) - Drill this hole ... R plane is .050 and return to Z1.00 ... these were modal from (2)
(4) - After drilling this hole ... return to R plane ... still set to Z.050
(5) - Drill this hole but start at the new R plane of Z-.100 ... return to Z-.100 after drilling ... G99 is modal.
(6) - Drill this hole but start at the new R plane of Z.050 ... return to Z1.00 after drilling this hole G99.
(7) - Cancel the canned cycle ... all modal canned cycle information is cleared.

On an Okuma machine ... users can set and re-set the Initial Plane through the G71 command. On a Fanuc / Haas control ... this is not so easy. You would have to cancel the current canned cycle with a G80 ... move the Z axis to the desired Initial Plane ... then re-command a new canned cycle to set a new Initial Plane.

So ... as we illustrated here ... it's fairly easy to efficiently and effectively machine holes on uneven surfaces using a combination of the return plane commands G98 / G99 / M53 / M54 and R plane settings. Although the Initial Plane. So ... STOP CUTTING AIR !!!